PAS Multi Meter Bridge can be configured in a number of different ways, to accurately model the
ballistics, responses and graphics of a wide range of standard peak programme meters. These
meters currently include the following:
IEC 268-10 Type I (Nordic N9 meter)
IEC268-10 Type IIb (EBU PPM meter)
IEC 268-10 Type IIa (BBC PPM meter)
DIN 45406
You can monitor 8 input channels, 16 input channels or 24 input channels in realtime. Choose between 5ms, 10ms, 15ms, 20ms and 300ms integration time.
Referenz level -18 dBFS or 0 dBFS.
|